Regional Location Map

  • 575 Hectares adjacent to the Valley Pit (Highland Valley Mine), Logan Lake, British Columbia
  • Brownfield project (past-producer) located adjacent to large active open-pit mining operation (Teck Resources Highland Valley Copper)
  • Located in mining friendly region of Southwestern British Columbia
  • GSPR has obtained historical data from historical operators and is consolidating and reinterpreting this data to support a Summer 2020 Drill program

History

  • Copper mineralization has been known in the area now covered by the Alwin property since late in the 19th century. Small-scale mining was conducted in the property area during the early 20th century. Recent exploration and mining was conducted during two periods: from 1967 to 1982 and from 2005 to 2008.
  • From 1967 to 1970: 6,940 m of surface diamond drilling in 81 holes was drilled along the main Alwin mineralized trend, and 5,860 m of underground drilling in 119 holes was completed in 1,400 m of development workings in the Alwin mine.
  • 1980, Dekalb Mining Corp. expanded the capacity of the mill to 700 tons (636.4 tonnes) per day and resumed mining of the main Alwin mineralized trend. Total production was 155,000 tonnes grading 1.54% copper. Mining was suspended in 1981 due to low copper prices. At the conclusion of mining, a trackless development decline had been extended to a depth of 270 m below surface (to an elevation of 1,400 m a.s.l.) and 3,935 m of drilling had been completed in 76 underground holes. Dekalb calculated a resource around the mine workings after mining terminated. A summary of this historical resource estimate calculation was reported to be a total of 390,000 tonnes of mineralization grading an average of 2.5% copper after factoring for 25% dilution. No cut-off grade was reported.
  • This historic resource was not calculated to current specifications and standards, and it is not compliant with National Instrument 43-101. It can not be deemed to be a current resource and it can not be relied upon. As noted further, the Company is not considering the estimate as current and further drilling is needed in order to upgrade the historical resource estimate.

2005 vs. 2014 Comparison

Drag centre bar to compare images

Alwin Mine 3D Digital Model

  • Includes known underground workings, separated into drift and declines, raises, cement filled, rock filled and open stopes and the numerous unmined copper+/- silver+/- gold mineralized portions of the 425 m long by 275 m deep by 150 m wide zone
  • GSP’s goal is to generate a bulk tonnage open pittable and/or block cave resource at the Alwin Mine
  • Potentially viable goal due to increasing copper prices, and the fact that an open pit operation with a much lower cutoff than 1.5% copper of the former underground mine may be able to economically mine the lower grade and smaller high-grade portions ignored by prior underground mining operators

2008 Drilling:

  • From 2005 until 2008 San Marco Resources Inc. explored the Alwin property. Work included 3-dimensional induced polarization and soil surveys, and geological mapping that covered the whole property area. In 2008, San Marco Resources Inc. conducted 1,304.5 m of NQ diamond drilling in 8 holes.
  • The first five holes (DDH 1 to 4A) were drilled into the main mineralized trend near the eastern part of the mine workings. The last three holes (DDH 5 to 7) tested induced polarization anomalies north and northwest of the mine. See the accompanying table for significant drill intersections.

2008 Drilling Sample Data Below

Drill Hole
Intersect (m)
Length (m)
Copper %
Molybdenum %
Gold gm/mt
DDH 08-01
67.5-69
1.5
0.1509
0.0087
0.028
-
87.5-88.5
1
0.1287
0.0032
0.041
-
89.5-90-5
1
0.1168
trace
0.004
DDH 08-02
20.8-21.2
0.5
8.453
0.0473
0.092
-
23-24.5
1.5
0.2884
0.0553
0.018
-
27.3-27.5
0.2
10.53
0.223
0.039
-
79.5-83
3.5
0.1206
0.0059
0.023
-
116.5-118
1.5
0.2042
0.0002
0.002
-
129.3-133.3
4
0.3714
0.0001
0.007
includes
132.9-133.3
0.4
2.458
0.0001
0.031
-
140-141
1
0.2457
0.0002
0.006
-
149-151
2
0.4271
0.032
0.004
-
155.8-159.2
3.7
0.4384
0.0005
0.001
DDH 08-03
35.9-39.5
3.6
0.2756
0.0018
0.018
includes
35.9-36.5
0.6
1.921
0.0024
0.022
-
49.5-52.8
3.3
2.3689
0.0201
0.071
-
74-76.2
2.2
1.4051
0.0027
0.043
includes
75.5-76.2
0.7
3.787
0.0069
0.111
-
82.5-87.5
5
0.6992
0.0019
0.017
-
102.5-104
1.5
0.6879
0.1715
0.008
Drill Hole
Intersect (m)
Length (m)
Copper %
Molybdenum %
Gold gm/mt
DDH 08-04A
17.5-19
1.5
0.4548
0.0003
0.054
-
40-41
1
0.1203
0.0063
0.007
-
92-93.5
1.5
0.1994
0.0014
0.001
-
111.5-113
1.5
0.1801
0.002
trace
-
114-115
1
0.8062
0.0009
0.004
-
117-130.5
13.5
1.8571
0.0046
0.383
includes
124.3-125.2
0.9
4.108
0.0117
0.944
and
127.5-130.5
3
6.2223
0.0093
1.454
DDH 08-05
153.5-155
1.5
0.2734
0.003
0.002
-
187.5-189
1.5
0.1189
0.0002
0.001
-
194.9-196.5
1.6
1.312
0.0221
0.014
-
196.8-197.5
0.7
1.542
0.0002
0.029
-
204-205
1
0.1955
0.0003
0.001
-
211-216
5
0.1089
0.0006
0.003
DDH 08-06
183-184
1
0.5953
0.0016
0.007
-
207.8-217.5
9.7
0.6268
0.0022
0.003
includes
210-211.2
1.2
2.205
0.012
0.007
-
220-221.5
1.5
0.1302
0.0004
trace
https://www.youtube.com/watch?v=nJLI2mwGT30&feature=youtu.be

3D INTERPRETATION UNDERWAY